第二次検定/実地/1級建築施工管理/穴埋問題等/令和7年~
ソイルプランニング
For the 2026 exam.
This app allows you to intensively study past exam questions (2025-2013) for the 1st Class Architectural Construction Management Engineer (Second Stage Examination/Practical) exam. (Excluding experience descriptions and schedules)
There are no in-app purchases or advertisements.
This app is for those aiming to pass by repeatedly reviewing past questions.
Study little by little on your mobile phone or tablet during your commute or breaks.
For each question, you can quickly check the answer [Question ⇒ Answer].
Also, the question text is included on the answer page, making it easy to review.
Study repeatedly on your mobile phone or tablet and aim for success.
● [Summary of matters to be noted or considered when planning the installation of temporary structures]
● [Summary of the content of work that may cause disasters and measures to prevent them, which were considered in advance when planning the construction]
● [Summary of points to note for the safe use of equipment or machinery]
Included Questions
*Reiwa 7 (Questions 2, 4, 5, 6)
*Reiwa 6 (Questions 2, 4, 5, 6)
Question 2 [Safety] Description of points to note
1. Backhoe with a bucket capacity of approximately 0.5 m³
2. Temporary power equipment for construction
3. Wheeled vertical lifting type aerial work platform
Question 4 [Construction] Description of points to note
1. Exterior wall tiling - Organic adhesive
2. Metalwork - Aluminum Coping
3. Plastering work - Self-leveling material application
4. Interior flooring work - Vinyl floor sheet
• Reiwa 5 (Questions 2, 4, 5, 6)
Question 2 [Safety] Description of points to note
1. Wedge-type scaffolding
2. Construction lift
3. Temporary road within the site
Question 4 [Construction] Description of points to note
1. Earthwork - Steel bracing method shoring
2. Rebar work - Bar support, spacer
3. Formwork - Steel deck plate for floor formwork
4. Concrete work - Pouring
• Reiwa 4 (Questions 2, 4, 5, 6)
Question 2 [Safety] Description of disaster countermeasures
1. Accidents due to falls
2. Accidents due to collapses
3. Accidents due to mobile cranes
Question 4 [Construction] Points to note Item Description
1. Roof Protection, Waterproofing, and Insulation Method - Protective Layer
2. Flooring Board - Nail Fastening Method
3. Exterior Synthetic Resin Emulsion Coating
4. Reinforced Concrete Structure - Steel Joinery
• Reiwa 3 (Questions 2, 4, 5, 6)
Question 2 [Temporary Installation] Notes
1. Temporary Gondola
2. On-site Temporary Office
3. Construction Gate (Vehicle Entrance/Exit)
Question 4 [Construction] Notes
1. Embedding Method for Precast Concrete Piles
2. Formwork Construction - Processing and Assembly of Column and Beam Formwork
3. Curing After Concrete Pouring
4. Steel Frame Construction - Tightening of High-Pressure Bolts
• Reiwa 2 (Questions 2, 3, 4, 6)
Question 2 [Safety] Notes
1. External Frame Scaffolding
2 . Concrete pump truck
3. Construction lift
Problem 4 [Construction] Notes on points to note
1. Exterior wall tiling - Organic adhesive
2. Roofing work - Metal corrugated sheet roofing
3. Interior work - Rock wool decorative sound-absorbing panel
4. Rigid polyurethane foam spraying
・Reiwa 1 (Problems 2, 3, 4, 6)
Problem 2 [Temporary installation] Notes on points to note
1. Load receiving platform
2. Steel plate temporary enclosure (excluding gates and access entrances)
3. Construction elevator
Problem 3 [Construction] Notes on points to note
1. Shoring support - Ground anchor
2. Rebar work - Rebar assembly
3. Concrete work - Pouring
4. Steel frame work - Re-erecting
・Heisei 30 (2018) Extraordinary (Problem 2, 3, 4, 6)
Problem 2 [Temporary Installation] Notes on Precautions
1. Temporary roads within the site
2. Construction lifts
3. Drainage (turbid water) treatment facilities
Problem 4 [Construction] Notes on Precautions
1. Rooftop asphalt waterproofing (insulation method)
2. Indoor floor - direct concrete leveling finish
3. Lightweight steel frame ceiling substructure work
4. Double-size tile - adhesive bonding
• 2018 (Problems 2, 3, 4, 6)
Problem 2 [Safety] Disaster countermeasures description
1. Accidents due to falls
2. Accidents due to electricity
3. Accidents due to construction machinery
Problem 4 [Construction] Notes on Precautions
1. Asphalt roofing
2. Synthetic resin emulsion thin finish
3. Aluminum coping
4 . Small-border tile - improved pressure bonding
• 2017 (Problems 2, 3, 4, 6)
Problem 2 [Temporary Installation] Notes on Precautions
1. Suspended scaffolding
2. Luffing (jib) tower crane
3. Temporary gondola
Problem 3 [Construction] Notes on Precautions
1. Precast concrete piles - embedded method
2. Reinforcement work - bar support, spacer
3. Prevention of cold joint occurrence
4. Sprayed rock wool (dry type, semi-dry type)
• 2016 (Problems 2, 3, 4, 6)
Problem 2 [Safety] Notes on Precautions
1. Long-span elevator
2. Aerial work platform (crawler type vertical lifting type)
3. Backhoe (bucket capacity approximately 0.5 m³)
Problem 4 [ [Construction] Notes on Precautions
1. Rooftop asphalt waterproofing protective layer
2. Self-leveling material application
3. Post-tiling method using organic adhesive
4. Rock wool decorative sound-absorbing panel installation
- 2015 (Problems 2, 3, 4, 6)
Problem 2 [Temporary Installation] Notes on Precautions
1. External frame scaffolding
2. Temporary power equipment
3. Load receiving platform
Problem 3 [Construction] Notes on Precautions
1. Earth drill method
2. Steel deck plate for floor formwork
3. Concrete - crack prevention
4. Steel frame construction - arc stud welding
- 2014 (Problems 2, 3, 4, 6)
Problem 2 [Safety] Disaster countermeasures description
1. Fall accidents
2. Collapse/collapse accidents
3. Heavy machinery Related Disasters
Problem 4 [Construction] Notes on Precautions
1. Metal Overlapping Corrugated Sheet Roofing
2. Synthetic Resin Emulsion Multi-Layer Finish Coating
3. Flooring Board - Nail Fastening Method
4. Gypsum Board Substrate - Direct Wallpaper Application Method
• 2013 (Problems 2, 3, 4, 6)
Problem 2 [Temporary Installation] Notes on Precautions
1. On-site Temporary Office
2. On-site Temporary Road
3. Steel Plate Temporary Fencing (Excluding Gates and Service Entrances)
Problem 3 [Construction] Notes on Precautions
1. Earth Drill Method
2. Rebar Work - Rebar Assembly
3. Formwork Work - Pipe Support
4. Steel Frame Erection - Temporary Bolts
One of the important things for obtaining qualifications is to repeatedly review past exam questions.
By repeatedly reviewing past exam questions, you can understand the question structure, the types of questions that appear, and your strengths and weaknesses. This allows you to develop an exam preparation plan, including which areas to focus on and where to earn points.
Find your own learning method and proceed with your studies systematically.
*While every effort has been made to ensure the accuracy of the suggested answers and example responses within the app, we cannot guarantee their accuracy.
We assume no responsibility for any inconvenience or disadvantage resulting from the use of this app.
*The content within the app may be added, updated, changed, or modified without prior notice.
This app allows you to intensively study past exam questions (2025-2013) for the 1st Class Architectural Construction Management Engineer (Second Stage Examination/Practical) exam. (Excluding experience descriptions and schedules)
There are no in-app purchases or advertisements.
This app is for those aiming to pass by repeatedly reviewing past questions.
Study little by little on your mobile phone or tablet during your commute or breaks.
For each question, you can quickly check the answer [Question ⇒ Answer].
Also, the question text is included on the answer page, making it easy to review.
Study repeatedly on your mobile phone or tablet and aim for success.
● [Summary of matters to be noted or considered when planning the installation of temporary structures]
● [Summary of the content of work that may cause disasters and measures to prevent them, which were considered in advance when planning the construction]
● [Summary of points to note for the safe use of equipment or machinery]
Included Questions
*Reiwa 7 (Questions 2, 4, 5, 6)
*Reiwa 6 (Questions 2, 4, 5, 6)
Question 2 [Safety] Description of points to note
1. Backhoe with a bucket capacity of approximately 0.5 m³
2. Temporary power equipment for construction
3. Wheeled vertical lifting type aerial work platform
Question 4 [Construction] Description of points to note
1. Exterior wall tiling - Organic adhesive
2. Metalwork - Aluminum Coping
3. Plastering work - Self-leveling material application
4. Interior flooring work - Vinyl floor sheet
• Reiwa 5 (Questions 2, 4, 5, 6)
Question 2 [Safety] Description of points to note
1. Wedge-type scaffolding
2. Construction lift
3. Temporary road within the site
Question 4 [Construction] Description of points to note
1. Earthwork - Steel bracing method shoring
2. Rebar work - Bar support, spacer
3. Formwork - Steel deck plate for floor formwork
4. Concrete work - Pouring
• Reiwa 4 (Questions 2, 4, 5, 6)
Question 2 [Safety] Description of disaster countermeasures
1. Accidents due to falls
2. Accidents due to collapses
3. Accidents due to mobile cranes
Question 4 [Construction] Points to note Item Description
1. Roof Protection, Waterproofing, and Insulation Method - Protective Layer
2. Flooring Board - Nail Fastening Method
3. Exterior Synthetic Resin Emulsion Coating
4. Reinforced Concrete Structure - Steel Joinery
• Reiwa 3 (Questions 2, 4, 5, 6)
Question 2 [Temporary Installation] Notes
1. Temporary Gondola
2. On-site Temporary Office
3. Construction Gate (Vehicle Entrance/Exit)
Question 4 [Construction] Notes
1. Embedding Method for Precast Concrete Piles
2. Formwork Construction - Processing and Assembly of Column and Beam Formwork
3. Curing After Concrete Pouring
4. Steel Frame Construction - Tightening of High-Pressure Bolts
• Reiwa 2 (Questions 2, 3, 4, 6)
Question 2 [Safety] Notes
1. External Frame Scaffolding
2 . Concrete pump truck
3. Construction lift
Problem 4 [Construction] Notes on points to note
1. Exterior wall tiling - Organic adhesive
2. Roofing work - Metal corrugated sheet roofing
3. Interior work - Rock wool decorative sound-absorbing panel
4. Rigid polyurethane foam spraying
・Reiwa 1 (Problems 2, 3, 4, 6)
Problem 2 [Temporary installation] Notes on points to note
1. Load receiving platform
2. Steel plate temporary enclosure (excluding gates and access entrances)
3. Construction elevator
Problem 3 [Construction] Notes on points to note
1. Shoring support - Ground anchor
2. Rebar work - Rebar assembly
3. Concrete work - Pouring
4. Steel frame work - Re-erecting
・Heisei 30 (2018) Extraordinary (Problem 2, 3, 4, 6)
Problem 2 [Temporary Installation] Notes on Precautions
1. Temporary roads within the site
2. Construction lifts
3. Drainage (turbid water) treatment facilities
Problem 4 [Construction] Notes on Precautions
1. Rooftop asphalt waterproofing (insulation method)
2. Indoor floor - direct concrete leveling finish
3. Lightweight steel frame ceiling substructure work
4. Double-size tile - adhesive bonding
• 2018 (Problems 2, 3, 4, 6)
Problem 2 [Safety] Disaster countermeasures description
1. Accidents due to falls
2. Accidents due to electricity
3. Accidents due to construction machinery
Problem 4 [Construction] Notes on Precautions
1. Asphalt roofing
2. Synthetic resin emulsion thin finish
3. Aluminum coping
4 . Small-border tile - improved pressure bonding
• 2017 (Problems 2, 3, 4, 6)
Problem 2 [Temporary Installation] Notes on Precautions
1. Suspended scaffolding
2. Luffing (jib) tower crane
3. Temporary gondola
Problem 3 [Construction] Notes on Precautions
1. Precast concrete piles - embedded method
2. Reinforcement work - bar support, spacer
3. Prevention of cold joint occurrence
4. Sprayed rock wool (dry type, semi-dry type)
• 2016 (Problems 2, 3, 4, 6)
Problem 2 [Safety] Notes on Precautions
1. Long-span elevator
2. Aerial work platform (crawler type vertical lifting type)
3. Backhoe (bucket capacity approximately 0.5 m³)
Problem 4 [ [Construction] Notes on Precautions
1. Rooftop asphalt waterproofing protective layer
2. Self-leveling material application
3. Post-tiling method using organic adhesive
4. Rock wool decorative sound-absorbing panel installation
- 2015 (Problems 2, 3, 4, 6)
Problem 2 [Temporary Installation] Notes on Precautions
1. External frame scaffolding
2. Temporary power equipment
3. Load receiving platform
Problem 3 [Construction] Notes on Precautions
1. Earth drill method
2. Steel deck plate for floor formwork
3. Concrete - crack prevention
4. Steel frame construction - arc stud welding
- 2014 (Problems 2, 3, 4, 6)
Problem 2 [Safety] Disaster countermeasures description
1. Fall accidents
2. Collapse/collapse accidents
3. Heavy machinery Related Disasters
Problem 4 [Construction] Notes on Precautions
1. Metal Overlapping Corrugated Sheet Roofing
2. Synthetic Resin Emulsion Multi-Layer Finish Coating
3. Flooring Board - Nail Fastening Method
4. Gypsum Board Substrate - Direct Wallpaper Application Method
• 2013 (Problems 2, 3, 4, 6)
Problem 2 [Temporary Installation] Notes on Precautions
1. On-site Temporary Office
2. On-site Temporary Road
3. Steel Plate Temporary Fencing (Excluding Gates and Service Entrances)
Problem 3 [Construction] Notes on Precautions
1. Earth Drill Method
2. Rebar Work - Rebar Assembly
3. Formwork Work - Pipe Support
4. Steel Frame Erection - Temporary Bolts
One of the important things for obtaining qualifications is to repeatedly review past exam questions.
By repeatedly reviewing past exam questions, you can understand the question structure, the types of questions that appear, and your strengths and weaknesses. This allows you to develop an exam preparation plan, including which areas to focus on and where to earn points.
Find your own learning method and proceed with your studies systematically.
*While every effort has been made to ensure the accuracy of the suggested answers and example responses within the app, we cannot guarantee their accuracy.
We assume no responsibility for any inconvenience or disadvantage resulting from the use of this app.
*The content within the app may be added, updated, changed, or modified without prior notice.
Developer email
soirupuranningu@gmail.com
Current version
2.1
Android version
7.0